Ashbridges Bay Treatment Plant – D Building Phase 2 Upgrades
Construction of a new Chemically Enhanced Primary Treatment (CEPT) Building and treatment system
New ferric chloride, ferrous chloride and polymer storage and dosing systems
Installation of new process blowers and channel flow control gates
Replacement and upgrades to grit piping and screenings handling systems
Refurbishment of primary clarifier sludge collectors, scum collectors and scum tanks
Ferrous chloride room refurbishment and process equipment upgrades
HVAC and plumbing upgrades, including new systems for the CEPT Building
Structural repairs to primary clarifiers, channels, weirs and baffle walls
Installation of a new elevator and associated architectural upgrades
Major electrical upgrades including 5 kV switchgear, transformers, MCCs, feeders, lighting and power distribution
Instrumentation, PLC, SCADA and process control system upgrades and commissioning
Civil and site works including watermains, duct banks, grading, roads, sidewalks, site lighting and landscaping
Demolition and modification of existing process, mechanical, electrical and control infrastructure
Complex process tie-ins, shutdown coordination and phased construction to maintain continuous plant operations