CEPT Winterization - Iona Island WWTP
Recent Bennett Construction Group Project
Owner:
Metro Vancouver
Contact Value:
$3,449,700.00
Scope of Work:
Demolition and disposal of existing alum and polymer distribution systems
Construct new twinned alignment for alum distribution system and dosing points
Construct new polymer distribution system, dosing stations and dosing points
Remove, relocate and reconnect existing Hand Control Valves, Flow Control Valves, Flow Indicating Transmitters and Flow Elements
Supply and Install new alum Flow indicating Transmitters
Supply and Install new heat trace system and insulation on new alum and polymer systems
Develop and install new seismic and structural engineered supports and braces
Commission new instruments and heat trace system and recommission reused equipment