Construction of Fleetwood Reservoir Phase 1 (Process Mechanical Subtrade)
Recent Bennett Construction Group Project
Owner:
Metro Vancouver
Contact Value:
$5,347,000.00
Scope of Work:
Supply and install new 900mm watermain, 900mm reservoir inlet, 500mm reservoir bypass piping and 900mm stainless steel reservoir cell distribution piping
Supply and install 1350mm gravity outlet piping between the reservoir cells and existing pump station
Install and commission flow control and pressure control valves of various sizes
Supply and install a 1350mm, and a 500mm diameter tilting disc check-valves
Fabricate and install reservoir cell sampling systems including custom sampling sinks and underdrain inspection boxes
Design, fabricate and install seismic restraints for process piping systems
Supply and install valve chamber sump discharge and washdown systems including pumps