F.M. Woods WTP Upgrades
New High Lift Pumping Station (HLPS) including new wet well, new dry well
Installation of preselected 6 new vertical turbine pumps with VFD.
Installation of 2 surge tanks.
Demolition of existing Pumping Station, partial demolition of Reservoir 3 Service Pumps, Electrical Room and Generator Room.
New Electrical Room
New SCADA Room
Modifications to Reservoir 3
Replacement of piping
HVAC systems
Electrical systems including 2 new diesel generators – 1 generator is provisional
Control and SCADA systems
Network communication systems
Install power and control wiring for each instrument
Maintaining existing roads used during construction and leaving these roads in as good a condition as they were prior to site work
Site restoration
Environmental protection during construction period.
Temporary Dewatering system during construction in accordance with PTTW
Cleaning up on completion.
Furnishing of materials, equipment, tools, implements, and labour.
Commissioning
Warranty period
Uninterrupted operation of the existing facility