F.M. Woods WTP Upgrades

Bennett Built
Logo representing the city of guelph
Contact Value: $35,600,000.00
Excavator and loader positioning a large blue industrial tank at a facility.
Concrete structural construction underway with reinforcing steel, formwork, and building materials on site.
Construction crew connecting a large concrete pipe to an underground drainage structure.
Interior construction area with concrete columns, wall formwork, and temporary support braces.
Construction workers installing large concrete pipes within reinforced steel rebar at a building site.

New High Lift Pumping Station (HLPS) including new wet well, new dry well

Installation of preselected 6 new vertical turbine pumps with VFD.

Installation of 2 surge tanks.

Demolition of existing Pumping Station, partial demolition of Reservoir 3 Service Pumps, Electrical Room and Generator Room.

New Electrical Room

New SCADA Room

Modifications to Reservoir 3

Replacement of piping 

HVAC systems

Electrical systems including 2 new diesel generators – 1 generator is provisional

Control and SCADA systems

Network communication systems

Install power and control wiring for each instrument

Maintaining existing roads used during construction and leaving these roads in as good a condition as they were prior to site work

Site restoration

Environmental protection during construction period.

Temporary Dewatering system during construction in accordance with PTTW

Cleaning up on completion.

Furnishing of materials, equipment, tools, implements, and labour.

Commissioning

Warranty period

Uninterrupted operation of the existing facility