G.E. Booth WWTP Tox 4 Rehabilitation & High Pressure Pipe Modifications
Recent Bennett Construction Group Project
Scope of Work
Demolition of the existing emergency generator ancillary equipment.
Design, fabrication and installation of new high pressure cake piping systems to TSSA requirements.
Complete replacement of fluidized bed incinerator dome.
Design, fabrication and installation of the cross over duct systems for incinerator 4 with 86" 316L S.S. shell
Removal of the existing primary heat exchanger and lower plenum for TOX 4
Installation of a pre-purchased new primary heat exchanger (including lower plenums) for TOX 4
Removal of the existing primary heat exchanger upper plenum and installation of the pre-purchased heat exchanger upper plenum
Fabrication and installation of new plenum connections between the Radiative Recuperator and the Quencher Systems
Fabrication and installation of new warm-air lower 90 between the PHE lower plenum
The design and installation of two expansion joints (86" and 56")
Modifications to the cooling air system
Modifications to the quencher water supply
Construction or New roof opening and roofing system