Headworks and Thickener Upgrades – Hespeler WWTP
Recent Bennett Construction Group Project
Scope of Work
Construction of a new headworks building and appurtenances
Installation of rotary drum screens
Installation of vortex tanks
Construction of a new administration building and appurtenances
Construction of a new membrane sludge thickening building and appurtenances
Installation of membrane sludge thickening system
Construction of new Peracetic Acid (PAA) building, pumping system and storage
Upgrades to clarifiers 1 and 2 rake mechanisms
New discharge piping in raw sewage pumping station
Demolition of existing grit tank and scum tank
Install approximately 370 metres watermain as well as two hydrants and meter chamber (including trenchless crossing of two creek crossings)
Rerouting of existing aeration and yard piping to allow for the construction of the membrane thickening building
Renovations and expansion of the existing administration building to convert into a workshop and electrical rooms
Testing and commissioning of all works