New Lynden Water System
Recent Bennett Construction Group Project
Scope of Work
Construction of New Access Road off Highway 99
Development of New Groundwater Supply Well for the Treatment Plant
Installation of New Yard piping
Construction of Cast-in-Place Treated Water Reservoir (320,000 L Capacity) and Overlying Precast Treatment Facility
Installation of New Treatment Systems and Equipment including;
- Air Stripper Package (complete with blowers)
- Static Mixers
- Transfer Pumps
- Cartridge Filtration System
- Odour Control Blowers
- Granular Activated Carbon Odour Control System
- Liquid chemical storage & feed systems (with fill station) for Sodium Hypochlorite
- Gas storage and feed system for Carbon Dioxide
Installation of 4 High Lift Vertical Turbine Pumps
Fabrication and Installation of All Associated Process Piping
Installation of New Main Electrical Power Transformer
Installation of New Fiber Line
Installation of New MCC, Standby Power Generator System, WAN, PAC and Back up Control Panel