Contact Value: $34,600,000.00
A close-up view of a steel pipe cylinder used in construction.
A large machine with metal pipes and cylinders is parked on a construction site.
A bulldozer operates in a snowy landscape, showcasing heavy machinery in winter conditions.
A winter daytime view of a city skyline featuring multiple high-rise buildings.
A construction site showcasing beams and pipes under natural light.
A blue-collar worker wearing a helmet and outerwear stands near heavy machinery.
A collection of composite materials and pipes used in wastewater treatment construction.
A composite material column and pipe structure in a factory setting.

Excavation, removal and disposal of 30,000 cubic meters of topsoil and subsoil from the reservoir roof

Installation of 40,000 square meters of hot applied rubberized asphalt waterproofing on the reservoir roof and new drainage system

Removal and replacement of 3,500 linear meters of expansion joint from the reservoir base

Construction of new interconnection chamber supplying the reservoir, new dichlorination chamber and new deflector valve chamber

Installation of new 1500mm deflector valve, 1500mm butterfly valves, 1350mm butterfly valves, 1350mm gate valves, 1200mm butterfly valves, 1050mm butterfly valves and 900mm butterfly valves

350 linear meters of CIPP lining in existing 300mm and 600mm storm drains

Installation of reservoir baffle wall system

Supply and installation of 25,000 cubic meters of granular backfilling upon completion of waterproofing works, 7,000 cubic meters of topsoil and 45,000 square meters of sod

Installation of new garden irrigation system and extensive architectural/landscaping improvements to David A. Balfour Park