Construction of Fleetwood Reservoir Phase 1 (Process Mechanical Subtrade)
Recent Bennett Construction Group Project
Owner: Metro Vancouver
Contract Value: $5,347,000.00
Scope of Work:
- Supply and install new 900mm watermain, 900mm reservoir inlet, 500mm reservoir bypass piping and 900mm stainless steel reservoir cell distribution piping
- Supply and install 1350mm gravity outlet piping between the reservoir cells and existing pump station
- Install and commission flow control and pressure control valves of various sizes
- Supply and install a 1350mm, and a 500mm diameter tilting disc check-valves
- Fabricate and install reservoir cell sampling systems including custom sampling sinks and underdrain inspection boxes
- Design, fabricate and install seismic restraints for process piping systems
- Supply and install valve chamber sump discharge and washdown systems including pumps